Quality oriented, technological innovation!
 wangjiabin@zyjxzz.com       +86-13812988858
Drawer guide cold bending machine
Home » News » Industry News » Method for reducing failure rate of fast changing CZ steel forming equipment

Method for reducing failure rate of fast changing CZ steel forming equipment

Views: 0     Author: Site Editor     Publish Time: 2022-04-27      Origin: Site

Method for reducing failure rate of fast changing CZ steel forming equipment

Cold-rolled steel products have a variety of properties suitable for a wide range of applications. In addition to its high strength cold rolled steel has high sag resistance and displays useful magnetic properties. It also readily accepts surface coatings such as enamel and paint. Manufacturing items with cold-rolled steel range from commercial products such as appliances and industrial products for bathtubs. Motor vehicles including motors, generators and transformers.

Quick change CZ steel forming equipment is dry cold rolling equipment, its operation is not too complex, because there is a computer control system, only important in the actual production process, the size and data you need to enter the computer can, this kind of control system will complete the production according to the relevant input, simple and convenient.

Quick change CZ steel forming equipment detection part: detection of quick change CZ steel forming equipment length pulse encoder, pressure type up and down travel switch, cutting tool up and down travel switch, pressure type up and down operation button, cutting tool up and down travel button, emergency stop switch, hydraulic start and stop switch and so on.

Our jingtang receives a lot of after-sales calls, and it is inevitable that customers may encounter many problems in the production process. At this time we can call the manufacturer, or some small problems we can deal with or even prevent. Such as:

First, hydraulic oil circuit

Quick change CZ steel forming equipment such as hydraulic system maintenance should also be checked, weekly check oil tank level. If the oil level is lower than the oil window, hydraulic oil should be added, which should not exceed 70℃. The system oil temperature should be between 35℃ and 60℃. If the oil level is too high, the oil quality and accessories will be damaged. The oil should be changed after 2000 hours of new machine work, and the oil tank should be cleaned every time the oil is changed.

Two, hydraulic components

Do not use detergent;

1. Clean hydraulic parts (base valve, motor, pump, oil pipe, etc.) every month to prevent dirt from entering the system, and check whether there is deformation at the bending of each oil pipe of the fast-changing CZ steel forming equipment.

2. After a month of use of the new machine, if there is abnormal should be replaced, after using two eyes, should tighten all accessories connection, this work should be shut down, no pressure system.

Three, filter

The filter should be replaced or thoroughly cleaned;

1. Check and clean each oil change every 3 months;

2. The air filter on the fuel tank should be replaced once a year;

3. Machine tool has related alarm or oil is not clean and other filter abnormalities.


Zhangjiagang Zhangyun Machinery Manufacturing Co., Ltd., founded in 2002 with a registered capital of 5 million, is a private technology enterprise in Jiangsu Province.At the beginning of the business, relying on local resources...MORE+

QUICK LINKS

CONTACT US

Tel:+86-13812988858
WhatsApp:+86-13812988858
Address:Xindong Road, Daxin Town, 
Zhangjiagang City, Jiangsu Province, China

BE IN THE KNOW

Promotions, new products and sales. Directly to your inbox.
Copyright © 2021 Zhangjiagang Zhangyun Machinery Manufacturing Co., Ltd.
Support By: Leadong